Scope of Work

Prepared study report that consists of analysis of all options to increase the water injection capacity of the system and options to transfer inject water to CDW-B from MOPU.

Prepared Budget cost summary and preliminary project schedule for options.

Performed design calculations and simulation.

Client : Petrofac Malaysia Limited

End User : Petrofac Malaysia Limited

Year : 2013

Status : Finished